FINCO MODEL · FINANCING F1
Sources & Uses
Generic Data Center Reference · Reconciliation and bankability evidence
LEGACY RUN — FINANCING EVIDENCE UNAVAILABLE. Historical Runs are not reconstructed from current assumptions.
Canonical funding reconciliation: UNAVAILABLE. Funding balance is separate from financial integrity and input freshness.
Financing sources
Canonical source totals and classifications from this exact persisted Run, where available. Instrument and equity splits are in “Funding by instrument” below, only where the Run persisted them.
| Source | kEUR |
|---|---|
| Actual sized Senior debt | 80,436.50 |
| Junior / other financing | Unavailable |
| Share capital and other equity | Unavailable |
| SHL cash contributed | 39,563.50 |
Project uses
Canonical project uses from this exact Run, with IDC, financing fees, DSRA and developer costs included under the engine’s existing categories.
| Use | kEUR |
|---|---|
| Hard project CAPEX | Unavailable |
| Capitalised IDC | Unavailable |
| Commitment fees | Unavailable |
| Structuring / bank fees | Unavailable |
| Other financing costs | Unavailable |
| Cash DSRA initial funding | Unavailable |
| Developer cost reimbursement | Unavailable |
| Developer fee | Unavailable |
| Other project uses | Unavailable |
Funding by instrument kEUR · CURRENT
UNAVAILABLE — this Run has no canonical financing evidence, so no instrument split exists. Nothing is reconstructed.
Debt capacity and bankability
Same Run: DSCR/gearing capacities, senior sizing, binding constraint and solver diagnostics where produced. Independent of the financial integrity verdict.
| Indicator | Value | Evidence |
|---|---|---|
| Actual gearing (Last Run) | 40.22% | RuntimeResult.runtime_summary.actual_gearing_pct |
| Gearing cap (Last Run) | 65.00% | RuntimeResult.runtime_summary.gearing_cap_pct |
| DSCR target | 1.30x | RuntimeResult.debt_schedule.summary.target_dscr |
| Minimum DSCR | 0.94x | RuntimeResult.debt_schedule.summary.actual_min_dscr |
| Minimum LLCR | Unavailable | RuntimeResult.debt_schedule.summary.min_llcr · Minimum LLCR not persisted. |
| DSCR debt capacity | Unavailable | ProjectFinancingResult.dscr_debt_capacity_keur · Legacy Run — financing evidence unavailable. A new canonical Run must persist the versioned engine SourcesAndUses result. Never backfill history. |
| Gearing debt capacity | Unavailable | ProjectFinancingResult.gearing_debt_capacity_keur · Legacy Run — financing evidence unavailable. A new canonical Run must persist the versioned engine SourcesAndUses result. Never backfill history. |
| Final sized Senior commitment | Unavailable | ProjectFinancingResult.final_senior_commitment_keur · Legacy Run — financing evidence unavailable. A new canonical Run must persist the versioned engine SourcesAndUses result. Never backfill history. |
| Binding Senior constraint | Unavailable | ProjectFinancingResult.binding_senior_constraint · Legacy Run — financing evidence unavailable. A new canonical Run must persist the versioned engine SourcesAndUses result. Never backfill history. |
| Gearing basis | Unavailable | ProjectFinancingResult.gearing_basis_keur · Legacy Run — financing evidence unavailable. A new canonical Run must persist the versioned engine SourcesAndUses result. Never backfill history. |
| Requested gearing cap (Run) | Unavailable | ProjectFinancingResult.gearing_ratio · Legacy Run — financing evidence unavailable. A new canonical Run must persist the versioned engine SourcesAndUses result. Never backfill history. |
| Fixed-point iterations | Unavailable | ProjectFinancingResult.fixed_point_iteration_count · Legacy Run — financing evidence unavailable. A new canonical Run must persist the versioned engine SourcesAndUses result. Never backfill history. |
| Fixed-point convergence residual | Unavailable | ProjectFinancingResult.fixed_point_maximum_difference_keur · Legacy Run — financing evidence unavailable. A new canonical Run must persist the versioned engine SourcesAndUses result. Never backfill history. |
Run Integrity and Sources & Uses balance are independent. CURRENT is an input freshness verdict, not a financial PASS.
Construction funding schedule · unavailable
LEGACY RUN — FINANCING EVIDENCE UNAVAILABLE. No historical backfill.
Current Working Copy assumptions
Separate typed input values, not the historic Run's funding allocation. Active scenario overrides and financing fixed-point results are not reconstructed here.
Sponsor funding mode: share_capital_then_shl
| Working input | Value | Source |
|---|---|---|
| Hard CAPEX input (not Total Project Uses) | 200,000.00 | Current typed ProjectInputs.capex.hard_capex_keur |
| Requested gearing ratio | 65.00% | Current typed ProjectInputs.financing.gearing_ratio |
| Configured senior amount (not sized debt) | 0.00 | Current typed ProjectInputs.financing.senior_debt_amount_keur |
| Share capital configuration | 90,000.00 | Current typed ProjectInputs.financing.share_capital_keur |
| Share premium configuration | 0.00 | Current typed ProjectInputs.financing.share_premium_keur |
| Other committed equity configuration | 0.00 | Current typed ProjectInputs.financing.other_equity_funding_before_shl_keur |
| Junior / other funding configuration | 0.00 | Current typed ProjectInputs.financing.junior_or_other_project_funding_keur |
| SHL configured amount (not actual principal) | 45,000.00 | Current typed ProjectInputs.financing.shl_amount_keur |
Changing an input leaves Last Run immutable and requires a new canonical Run to change financing results.
Balance Sources & Uses
Read-only — Apply not enabled. Balance S&U is disabled: no approved atomic financing-stack update contract covers equity/SHL/source selection, owner authorization, protected references, workbook CAS, scenario identity and new-Run reconciliation.
A future balancing preview must identify the funding source to change, the current authorized requirement and outstanding constraints, and seek explicit user approval before an atomic persisted update. It must never edit displayed totals.
Historical run evidence
Choose a committed Run to inspect its own stored numbers; current inputs never backfill historical evidence.
Evidence lineage and missing authorities
Legacy Run — financing evidence unavailable. A new canonical Run must persist the versioned engine SourcesAndUses result. Never backfill history.
Funding waterfall: LEGACY RUN — FINANCING EVIDENCE UNAVAILABLE. No historical backfill.
Working input, persisted canonical result and engine-only field are different classes of evidence. Unavailable does not mean zero; CURRENT does not imply financial integrity PASS; STALE does not imply FAIL.