Sources & Uses

Generic EV Charging Hub Reference · Reconciliation and bankability evidence

← Back to Model workspace

Run evidence

Last Run · CURRENT · 2026-09-28T13:53:33.817925+00:00 · Snapshot canonical_last_run__generic_ev_charging_reference__20260928T135333817925Z

Run scenario: Not persisted · Working scenario: Base

Financial integrity UNAVAILABLE Not equivalent to S&U balance

LEGACY RUN — FINANCING EVIDENCE UNAVAILABLE. Historical Runs are not reconstructed from current assumptions.

Total Sources Unavailable kEUR · Legacy Run — financing evidence unavailable. A new canonical Run must persist the versioned engine SourcesAndUses result. Never backfill history.
Total Uses Unavailable kEUR · Legacy Run — financing evidence unavailable. A new canonical Run must persist the versioned engine SourcesAndUses result. Never backfill history.
Funding Residual Unavailable kEUR · Legacy Run — financing evidence unavailable. A new canonical Run must persist the versioned engine SourcesAndUses result. Never backfill history.

Canonical funding reconciliation: UNAVAILABLE. Funding balance is separate from financial integrity and input freshness.

Financing sources

Canonical source totals and classifications from this exact persisted Run, where available. Instrument and equity splits are in “Funding by instrument” below, only where the Run persisted them.

SourcekEUR
Actual sized Senior debt5,850.00
Junior / other financingUnavailable
Share capital and other equityUnavailable
SHL cash contributed2,650.00

Project uses

Canonical project uses from this exact Run, with IDC, financing fees, DSRA and developer costs included under the engine’s existing categories.

UsekEUR
Hard project CAPEXUnavailable
Capitalised IDCUnavailable
Commitment feesUnavailable
Structuring / bank feesUnavailable
Other financing costsUnavailable
Cash DSRA initial fundingUnavailable
Developer cost reimbursementUnavailable
Developer feeUnavailable
Other project usesUnavailable

Funding by instrument kEUR · CURRENT

UNAVAILABLE — this Run has no canonical financing evidence, so no instrument split exists. Nothing is reconstructed.

Debt capacity and bankability

Same Run: DSCR/gearing capacities, senior sizing, binding constraint and solver diagnostics where produced. Independent of the financial integrity verdict.

IndicatorValueEvidence
Actual gearing (Last Run)65.00% RuntimeResult.runtime_summary.actual_gearing_pct
Gearing cap (Last Run)65.00% RuntimeResult.runtime_summary.gearing_cap_pct
DSCR target1.30x RuntimeResult.debt_schedule.summary.target_dscr
Minimum DSCR1.30x RuntimeResult.debt_schedule.summary.actual_min_dscr
Minimum LLCRUnavailable RuntimeResult.debt_schedule.summary.min_llcr · Minimum LLCR not persisted.
DSCR debt capacityUnavailable ProjectFinancingResult.dscr_debt_capacity_keur · Legacy Run — financing evidence unavailable. A new canonical Run must persist the versioned engine SourcesAndUses result. Never backfill history.
Gearing debt capacityUnavailable ProjectFinancingResult.gearing_debt_capacity_keur · Legacy Run — financing evidence unavailable. A new canonical Run must persist the versioned engine SourcesAndUses result. Never backfill history.
Final sized Senior commitmentUnavailable ProjectFinancingResult.final_senior_commitment_keur · Legacy Run — financing evidence unavailable. A new canonical Run must persist the versioned engine SourcesAndUses result. Never backfill history.
Binding Senior constraintUnavailable ProjectFinancingResult.binding_senior_constraint · Legacy Run — financing evidence unavailable. A new canonical Run must persist the versioned engine SourcesAndUses result. Never backfill history.
Gearing basisUnavailable ProjectFinancingResult.gearing_basis_keur · Legacy Run — financing evidence unavailable. A new canonical Run must persist the versioned engine SourcesAndUses result. Never backfill history.
Requested gearing cap (Run)Unavailable ProjectFinancingResult.gearing_ratio · Legacy Run — financing evidence unavailable. A new canonical Run must persist the versioned engine SourcesAndUses result. Never backfill history.
Fixed-point iterationsUnavailable ProjectFinancingResult.fixed_point_iteration_count · Legacy Run — financing evidence unavailable. A new canonical Run must persist the versioned engine SourcesAndUses result. Never backfill history.
Fixed-point convergence residualUnavailable ProjectFinancingResult.fixed_point_maximum_difference_keur · Legacy Run — financing evidence unavailable. A new canonical Run must persist the versioned engine SourcesAndUses result. Never backfill history.

Run Integrity and Sources & Uses balance are independent. CURRENT is an input freshness verdict, not a financial PASS.

Construction funding schedule · unavailable

LEGACY RUN — FINANCING EVIDENCE UNAVAILABLE. No historical backfill.

Current Working Copy assumptions

Separate typed input values, not the historic Run's funding allocation. Active scenario overrides and financing fixed-point results are not reconstructed here.

Sponsor funding mode: share_capital_then_shl

Working inputValueSource
Hard CAPEX input (not Total Project Uses)9,000.00Current typed ProjectInputs.capex.hard_capex_keur
Requested gearing ratio65.00%Current typed ProjectInputs.financing.gearing_ratio
Configured senior amount (not sized debt)0.00Current typed ProjectInputs.financing.senior_debt_amount_keur
Share capital configuration500.00Current typed ProjectInputs.financing.share_capital_keur
Share premium configuration0.00Current typed ProjectInputs.financing.share_premium_keur
Other committed equity configuration0.00Current typed ProjectInputs.financing.other_equity_funding_before_shl_keur
Junior / other funding configuration0.00Current typed ProjectInputs.financing.junior_or_other_project_funding_keur
SHL configured amount (not actual principal)2,650.00Current typed ProjectInputs.financing.shl_amount_keur

Changing an input leaves Last Run immutable and requires a new canonical Run to change financing results.

Balance Sources & Uses

Read-only — Apply not enabled. Balance S&U is disabled: no approved atomic financing-stack update contract covers equity/SHL/source selection, owner authorization, protected references, workbook CAS, scenario identity and new-Run reconciliation.

A future balancing preview must identify the funding source to change, the current authorized requirement and outstanding constraints, and seek explicit user approval before an atomic persisted update. It must never edit displayed totals.

Historical run evidence

Choose a committed Run to inspect its own stored numbers; current inputs never backfill historical evidence.

Evidence lineage and missing authorities

Legacy Run — financing evidence unavailable. A new canonical Run must persist the versioned engine SourcesAndUses result. Never backfill history.

Funding waterfall: LEGACY RUN — FINANCING EVIDENCE UNAVAILABLE. No historical backfill.

Working input, persisted canonical result and engine-only field are different classes of evidence. Unavailable does not mean zero; CURRENT does not imply financial integrity PASS; STALE does not imply FAIL.